East Asia, grain terminal
Maize intake line
Four DC Mini FT units in SS304 were fitted to the chute outlets. The operator now fills each storage bay from one outlet where two were needed before. The consolidated column drives into the pile and pushes it outward, so the bay fills lower and wider instead of peaking under the fill point.




